General Laborer Yokosuka Provisions
LOAD / STOW SUBSISTENCE AND SUPPLIES.
- The contractor shall transport all subsistence items and supplies from the staging area to the designated location onboard the ship, using daisy chain and or dolly / cart / conveyor methods. The contractor shall provide limited stock rotation and or provisions relocation with-in ships storerooms to allow proper stowage of ships provisions.
- The Contractor will clean up any debris created from transporting of stores. All items shall be neatly stowed in accordance with technical direction as provided by the Jack-Of-The Dust or Customer Representative. The Jack–Of-The-Dust or other ship’s representative will verify receipt document matches provisions received and quantity.
- The contractor shall stack empty pallets in a central location on the hangar bay or pier. The contractor shall remove all debris from work areas. The Government (Ships force) is responsible for storeroom preparation.
- Material stowed accurately in accordance with technical as provided by the Customer Representative or the Jack-In-The-Dust.
- Material loaded and stowed within scheduled time frames as specified in the advance schedule.
- Professional appearance and good personal hygiene of contractor personnel.
- Security procedures are followed as provided by U.S. Navy and local port Operations.
- No damage occurred during load and stowage procedures.
REQUIRED QUALIFICATIONS AND EXPERIENCE :
Contractors will be required to lift items up to 60 lbs.Please note that pursuant to a government contract, this position requires U.S. Citizenship status.Must be SOFA sponsored.